Shoshone Silver Mining Winter Update
* Reuters is not responsible for the content in this press release.
WALLACE, ID, Apr 10 (MARKET WIRE) --
Exploration is continuing at Shoshone's (OTCBB: SHSH) Bilbao project in
Zacatecas, Mexico. The goal of the current drill program is to upgrade the
categorization of the existing resource in pursuit of Canadian National
Instrument 43-101 compliance. A press release summarizing the ongoing infill
drilling may be viewed at
http://www.mincoplc.com/newsReleases/2008/BilbaoDrillResults06022008.pdf.
Shoshone is continuing to enhance its Lakeview Mill. Expanded lighting,
insulation
and sheeting have been installed in the mill building, enabling year round
milling
operation. A roof was constructed over the ore chute, and heavy equipment for
transporting ore has been refurbished and upgraded to meet current safety
standards. These improvements will be completed by May, at which time ore
processing will resume.
During summer, 2008 Shoshone expects to be mining limited amounts of ore
from
the Weber Shear, the mineralized structure that hosts both the Weber and Keep
Cool mines. Fresh ore from this operation will be processed at the nearby
Lakeview Mill. The company anticipates shipping concentrates from the mill in
late
fall.
Shoshone holds 1100 acres in the Lakeview District containing 6 formerly
producing
mines. The company plans to begin a district-wide exploration program in July,
focusing first on identification of underground structures followed by an
aggressive
drill program targeting mineralized structures.
For further information, please visit the company's website at
www.shoshonesilvermining.com.
Certain statements contained in this press release are "forward-looking
statements" within
the meaning of the Private Securities Litigation Reform Act of 1995. Such
statements are based on beliefs of management as well as assumptions made by
and information currently available to management. Forward-looking statements
are
subject to risks, uncertainties and other factors that could cause actual
results to differ materially from expected results.
Contact:
Investor Relations
Liz Wilhite
Moechine Solutions
Email Contact
(208) 512-3009
Shoshone Silver Mining
Email Contact
(208) 752-1070
Copyright 2008, Market Wire, All rights reserved.
-0-
Comments (0)
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.



Follow Reuters