VMS Reports 19.8 Meters Grading 2.70% Copper in Hole RD-08-35 at Reed Lake Discovery Zone

* Reuters is not responsible for the content in this press release.

Thu Jun 19, 2008 6:30am EDT

  VANCOUVER, BRITISH COLUMBIA, Jun 19 (MARKET WIRE) -- 
VMS Ventures Inc. (TSX VENTURE: VMS) (the "Company") is pleased to report
on its ongoing exploration program at the Reed Lake Discovery Zone near
Snow Lake, Manitoba.


Highlights:

RD-08-35:            19.80 m (64.96 ft) of 2.70% Cu and 1.72% Zn

                     Including 12.11 m (39.73 ft) of 3.52% Cu and 1.96% Zn

                     Including 7.51 m (24.64 ft) of 5.02% Cu and 1.77% Zn


    Hole RD-08-35 was drilled from the same set up and azimuth as holes
RD-08-23 and RD-08-38 and approximately 45 m to the east of the western
most intercept of mineralization so far, hole RD-08-39.

    One drill continues testing the strike and depth extent of mineralization
at the western edges of the Discovery Zone and a second drill is testing
the Discovery Zone mineralization to the east and to depth.

    A third drill is testing a strong off hole conductor detected in a recent
downhole survey of hole TZ-08-02, related to the Tower Zone anomaly,
1,000 m to the east of the Discovery Zone. The Tower Zone anomaly is a
series of geophysical conductor anomalies that have been identified in
airborne, and in greater detail in the DeepEM survey over a 1.2 km
length. Previous holes in the area have not explained the conductor, but
have intercepted altered rocks and trace amounts of copper and zinc
sulphides along with iron sulphides, in what may represent foot wall
alteration to a VMS deposit.


TABLE I
DRILL HOLE ASSAYS FOR RD-08-35

--------------------------------------------------------------------------
DRILL         FROM       TO                Cu       Zn        Ag        Au
HOLE            (m)      (m)   INT(i)       %        %       g/t       g/t
--------------------------------------------------------------------------
RD-08-35    180.18   199.98    19.80     2.70     1.72      6.23      0.48
--------------------------------------------------------------------------
inc         187.55   199.66    12.11     3.52     1.96      8.73      0.62
--------------------------------------------------------------------------
inc         192.15   199.66     7.51     5.02     1.77     12.71      0.85
--------------------------------------------------------------------------
(i) True Thickness unknown

TABLE II
DRILL HOLE ASSAYS FOR RD-08-36

--------------------------------------------------------------------------
DRILL         FROM       TO             Cu(ii)   Zn(ii)   Ag(iii)   Au(iii)
HOLE            (m)      (m)   INT(i)       %        %       g/t       g/t
--------------------------------------------------------------------------
RD-08-36    133.20   214.27    81.07     3.54     0.26      5.47      0.25
--------------------------------------------------------------------------
inc         169.77   206.35    36.58     5.64     0.13      9.73      0.48
--------------------------------------------------------------------------
inc         187.36   206.35    18.99     7.10     0.17     10.51      0.73
--------------------------------------------------------------------------
(i) True Thickness unknown  (ii) Previously released  (iii) New data

TABLE III
DESCRIPTION OF MINERALIZED INTERVALS RD-08-38, RD-08-39 and RD-08-41
(Assays Pending)

--------------------------------------------------------------------------
DRILL         FROM       TO
HOLE            (m)      (m)   INT(i)     MINERALIZATION DESCRIPTION
--------------------------------------------------------------------------
RD-08-38    198.25   270.36    72.11      Sulphide Veinlets
--------------------------------------------------------------------------
RD-08-39    188.92   203.34    14.42      Near Solid Sulphide
--------------------------------------------------------------------------
RD-08-41    332.13   365.96    33.83      Near Solid Sulphide and Veinlets
--------------------------------------------------------------------------
Inc         332.13   336.14     4.01      Near Solid Sulphide
--------------------------------------------------------------------------
Inc         346.92   365.65    18.73      Near Solid Sulphide
--------------------------------------------------------------------------
(i) True thickness unknown


    All technical information in this release has been reviewed by the
Qualified Person, Dr. George Gale, P.Eng. Samples are prepared and
analyzed at Activation Laboratories, Ancaster, Ontario using acid digest
assay analytical methods.

    VMS Ventures Inc. is focused primarily on acquiring, exploring and
developing copper-zinc properties in the Flin Flon-Snow Lake VMS Belt.
The Company also holds the largest land package considered prospective
for nickel-copper mineralization at Lynn Lake, which is to date Canada's
third largest nickel producing camp. The Company's project portfolio
consists of the Snow Lake VMS project, the Lynn Lake Gabbros
nickel-copper project, the Nickel Belt project, the South Bay
nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite Complex,
Specialty Metals property. All VMS Ventures Inc. properties are located
in the mining friendly province of Manitoba, Canada.

    ON BEHALF OF THE BOARD OF DIRECTORS

    John Roozendaal, B. Sc., President & Director


 
 The TSX Venture
Exchange has not reviewed and does not accept responsibility for the
adequacy or accuracy of this news release.

Contacts:
VMS Ventures Inc.
Keith Patey
Director of Communications
(604) 986-2020 or Toll Free: 1-866-816-0118
(604) 986-2021 (FAX)
Website: www.vmsventures.com

Coal Harbor Communications
Dale Paruk
(604) 662-4505 or Toll Free: 1-877-642-6200

Copyright 2008, Market Wire, All rights reserved.

-0-
Comments (0)
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.