Huge hydroelectric dam approved in Brazil's Amazon

Related Topics

BRASILIA | Tue Feb 2, 2010 9:12am EST

BRASILIA (Reuters) - Brazil granted an environmental license on Monday for the construction of a controversial hydroelectric dam in the heart of the Amazon rainforest.

The $17 billion project on the Xingu River in the northern state of Para will help the fast-growing Latin American country cope with soaring demand for electricity but has raised concern about its impact on the environment and native Indians.

Environment Minister Carlos Minc said 97 square miles/500 sq km of land would be flooded by the Belo Monte dam, a fraction of the 1,900 square miles/5,000 sq km, in the original plans that involved four hydroelectric dams. It was scaled down for ecological reasons.

Around half the area, or 48 square miles, are already flooded naturally for part of the year during the rainy season.

"The environmental impact exists but it has been weighed up, calculated and reduced," Minc said.

The 11,000-megawatt Belo Monte dam is part of Brazil's largest concerted development plan for the Amazon since the country's military government cut highways through the rainforest to settle the vast region during its two-decade reign starting in 1964.

Dams, roads, gas pipelines, and power grids worth more than $30 billion are being built to tap the region's vast raw materials, and transport its agricultural products in coming years.

The license lists 40 requirements that must be fulfilled by the company that wins the bid to construct the dam -- before it can begin building. It includes more studies, construction of local infrastructure and maintenance of the local environment.

The winning bidder would have to pay 1.5 billion reais ($803 million), the estimated cost of fulfilling these demands through public and private entities. It includes the cost of rehousing an estimated 12,000 people who would be relocated.

"Not one Indian on indigenous land will be displaced," he said. Others living in one town outside protected lands would be resettled and compensated, he added.

Environmental groups say the Belo Monte project, which will also create a waterway to transport agricultural commodities grown in the Amazon, would damage the sensitive ecosystem and threaten some fish species.

Minc said measures would be taken to prevent the extinction of some species and protect the livelihoods of those who make a living by fishing, both for food and for the rare ornamental fish that live in the river.

Minc said it was unlikely more dams would be added to the project in the future, but he did not rule it out.

Among the utilities wanting to build and operate the dam are Brazil's state-run Eletrobras. ($=1.866 reais)

(Reporting by Rodrigo Viga Gaier and Maria Carolina Marcello; Writing by Peter Murphy; Editing by Doina Chiacu)

Related Quotes and News

Company
Price
Related News
We welcome comments that advance the story through relevant opinion, anecdotes, links and data. If you see a comment that you believe is irrelevant or inappropriate, you can flag it to our editors by using the report abuse links. Views expressed in the comments do not represent those of Reuters. For more information on our comment policy, see http://blogs.reuters.com/fulldisclosure/2010/09/27/toward-a-more-thoughtful-conversation-on-stories/
Comments (1)
linyuyu wrote:
Want To Find Cheap shoes and clothing?The Faithworthy Shoes From The Official Appointed Factory In China?Enjoy The Authentic Shoes and clothing With the Fake Price!Low to $55,Free Delivery In One Week And No Sale Tax!
www.ongoin.com
We offer a large rank of Puma Shoes. All of them are original level and cheap,either retail or wholesale is accept on ongoin.com,we can offer the lowest price with the Original Puma Shoes, if your order is up to 50PCS,the Price will be more favorable.We provid perfect after sale service,Delivery Free and No Sake Tax.Please trust to purchase!
http://www.ongoin.com
www.onseeking.com
E-mail:ongoin@msn.com

Feb 03, 2010 1:15am EST  --  Report as abuse
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.