Sponsored Links
U.S. refinery shutdowns- Motiva, Exxon, Sunoco
July 16 (Reuters) - Summary of current U.S. refinery operations (in '000 bpd)
-As Motiva investigates, no good news at stricken Texas refinery
-Exxon reports equipment upset at Illinois refinery
-TABLE: U.S. refining capacity offline to drop this week-IIR
-Exxon Torrance, Ca, refinery reports planned flaring
-Sunoco restarted vacuum tower unit at Philadelphia refinery
-Tesoro says turnaround activities at Kenai refinery complete
===============================================================================================
ECONOMIC RATE CUT ANNOUNCEMENTS
================================================================================================
Company Location/Units Affected Amount of Cut Timing Link
************************************************************************************************
FLINTHILLS North Pole, AK 140 Apr 11, 2012
HOVENSA St. Croix, US VI 350 Feb 21, 2012
PHILLIPS 66 Trainer, PA 185 Indefinite
SUNOCO Eagle Point, NJ 145 Permanent
Marcus Hook, PA 178 Indefinite
VALERO Aruba 235 Mar 29, 2012
Corpus Christi, TX/FCC
================================================================================================
REFINERY SHUTDOWNS
================================================================================================
Company Location Units Cap. Timing Reason/Notes Link
EAST COAST
*****************************************2012 Q3************************************************
PBF Delaware City,DE Refinery 182.2 Jul 11 Emissions
Compressor Jul 09 Trip
Jul 05 Failure
Paulsboro, NJ Refinery 195 Jul 06 Equipment upset
SUNOCO Philadelphia, PA Vacuum Tower 335 Jul 14 Restarted
Refinery Jul 02 Deal reached
*****************************************2012 Q2************************************************
DELTA Trainer, PA Refinery 185 Jun 22 Deal closed
PBF Delaware City,DE Unit Jun 08 Repairs ongoing
SUNOCO Philadelphia, PA Refinery 335 Jun 30 Restarts units
Jun 27 Deal with union
Vacuum Tower Jun 22 Shutdown
Refinery Jun 14 Near deal
================================================================================================
GULF COAST
*****************************************2012 Q3************************************************
EXXON Beaumont, TX Unit 344.5 Jul 11 Shutdown
FLINT Corpus Christi, Refinery 290.08 Jul 10 Pump malfunction
HILLS TX
MARATHON Garyville, LA HCU, CDU Nov 2012 Expansion
MOTIVA Port Arthur, TX Refinery 600 Jul 16 Restart delayed
PHILLIPS 66 Sweeney, TX FCCU 247 Jul 12 Coker flare
TOTAL Port Arthur, TX Refinery 225.5 Jul 11 Leak
VALERO Corpus Christi,TX CDU Jul 02 Maintenance
Houston, TX FCCU 88 Jul 11 Planned rates
Port Arthur, TX Hydrotreater 292 Jul 11 Shut
Compressor Jul 10 Shutdown
WESTERN El Paso, TX Refinery 2013 Turnaround
2014 Turnaround
*****************************************2012 Q2************************************************
DELEK Tyler, TX FCC May 10 Maintenance
================================================================================================
MIDCONTINENT
*****************************************2012 Q3************************************************
CITGO Lemont, IL Compressor 167 Jul 09 No impact
Failure
CVR ENERGY Wynnewood, OK Refinery 70 Jul 05 Maintenance
Q4 2012 Turnaround
EXXON Joliet, IL Refinery 238.6 Jul 16 Upset
HOLLY- Tulsa, OK Refinery 155.3 2H 2012 Turnaround
FRONTIER
HUSKY Lima, OH Refinery 155 Jul 11 Delays work
MARATHON Catlettsburg, KY Refinery 212 Jul 09 Restarting
Shutdown
Detroit, MI Refinery 106 Q3 2012 Turnaround
Robinson, IL Refinery 206 Jul 03 Restart units
PHILLIPS66 Ponca City, OK Refinery 198.4 Jul 10 Planned work
TESORO Mandan, ND Refinery 60 End-Q2 Expansion
*****************************************2012 Q2************************************************
BP Whiting, IN Sulfur Unit 405 Jun 25 SRU restarted
Jun 21 Fire put out
CITGO Lemont, IL Refinery 167 Jun 20 Failure
===============================================================================================
ROCKY MOUNTAINS
*****************************************2012 Q3************************************************
HOLLY- Wood Cross, UT FCC 2H 2012 Turnaround
FRONTIER Refinery 31 Future Expansion
2012-2014 Expansion
================================================================================================
WEST COAST
*****************************************2012 Q3************************************************
EXXON Torrance, CA Refinery 149.5 Jul 16 Planned flaring
PHILLIPS66 Wilmington, CA Refinery 139 Jul 12 Planned flaring
Jul 08 Planned work
TESORO Wilmington, CA DCU 96.9 Jul 09 Unit upset
Kenai, AK Refinery 68 Jul 13 Maintenance done
*****************************************2012 Q2************************************************
CHEVRON Richmond, CA Refinery 245.3 May 13 Maintenance
SHELL Martinez, CA Refinery 156.4 Apr 27 Maintenance
================================================================================================
- Tweet this
- Link this
- Share this
- Digg this
- Reprints
Comments (0)
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.


Follow Reuters