January 10, 2011 / 9:09 PM / in 7 years

Alyeska preparing Alaska pipe restart plan-sources

HOUSTON, Jan 10 (Reuters) - Alyeska Pipeline was preparing a plan to restart the trans-Alaska crude oil pipeline this week, pending regulatory approval, sources familiar with pipeline operations said on Monday.

The Trans-Alaska Pipeline System was shut on after a leak was discovered on Saturday.

Alyeska and state regulators said earlier on Monday there was no restart date set for the pipeline that carries crude oil from Alaska’s North Slope to the port of Valdez. (Reporting by Erwin Seba; Editing by David Gregorio)

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below