Tunnel delays latest blow to downtown Seattle revitalization

Comments (2)
Randy549 wrote:

“But the transportation department has insisted that any potential red ink will be the responsibility of the contractor.”

Hard to believe that the contractor would willingly absorb the extra costs caused by running into a steel rod that was left there years earlier by the state transportation department. I smell a fish.

Apr 21, 2014 11:21pm EDT  --  Report as abuse
Dehumanist wrote:

How could a steel pipe cause a digging machine to stop working for that long?

Apr 22, 2014 8:13am EDT  --  Report as abuse