Reuters logo
UK-Belgium gas pipe maintenance planned June 2013
September 14, 2012 / 10:41 AM / 5 years ago

UK-Belgium gas pipe maintenance planned June 2013

LONDON, Sept 14 (Reuters) - The operator of the gas pipeline connecting Britain and Belgium said on Friday it was proposing to carry out next year’s annual maintenance from June 12-27.

“The proposal is to commence 06:00 (local time) 12 June 2013 for a period of 15 days, resuming flow 06:00 (local time) 27 June 2013,” Interconnector UK said in a statement.

“Connected transporters and shippers are being consulted on the proposed timing... The closing date for any comments is 3 October 2012,” the statement added.

Following this consultation period the maintenance dates will be confirmed and published on October 8.

The bi-directional gas pipeline is capable of transporting around 810 gigawatt-hours (GWh) per day from Zeebrugge (Belgium) to Bacton (UK) and 630 GWh/d in the opposite direction. (Reporting by Henning Gloystein; Editing by Andrew Heavens)

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below