International Wayside Gold Mines Ltd.: Drill Program Discovers 250 Foot Replacement Style Mineralized Zone

Mon Jul 6, 2009 10:28am EDT
 
[-] Text [+]
  VANCOUVER, BRITISH COLUMBIA, Jul 06 (MARKET WIRE) -- 
The Board of Directors of International Wayside Gold Mines Ltd. (the
"Company") (TSX VENTURE: WYG)(FRANKFURT: IWUB) announces that results of
ten surface diamond drill holes totaling 1,761.2m (5,778.0 feet) on the
Goldfinch Zone, 700 feet mine grid west of the proposed Bonanza Ledge
mine on Barkerville Mountain were returned with some encouraging gold
values (Table 1). Details of a new phase of drilling at Barkerville
Mountain beginning today (July 6, 2009), are forthcoming.

    Targeting a Bonanza Ledge style of pyrite replacement gold
mineralization, the drill program was designed using geo-statistics or
geo-mathematics, which comprehensively considers geology (lithology,
structure, alteration and mineralization), geochemistry (soil anomalies)
and geophysics (IP, SP and magnetic surveys) on and between the Goldfinch
and Bonanza Ledge Zones at Barkerville Mountain. Comparisons of the two
zones show their similarity is over 98%.

    Most of the drill holes successfully intercepted fine-grained pyrite
replacement zones in the Lowhee Unit, which hosts the Bonanza Ledge gold
deposit. The drill results prove that large replacement style mineralized
zones containing high-grade fine grained pyrite up to 250 feet thick
exist in the Goldfinch Zone. A geological evaluation is underway due to
the fact that not all of the pyrite replacement bodies carry gold.

    An additional purpose of the drilling program is to have a better
understanding of the geology at depth, the relationship between the gold
mineralization zone and the pyrite replacement mineralization, pyrrhotite
halo and fuchsite alteration, and the mineralization intensity at depth.
In order to realize this, three long drill holes up to 356.0m (1,168
feet) each were conducted.

    Further drilling will take place between the Lowhee Fault and Goldfinch
Fault in the coming exploration season targeting Bonanza Ledge and quartz
vein style of gold mineralization. This area has approximately the same
geological setting as that of Bonanza Ledge gold deposit.


Table 1. SURFACE DRILL RESULTS

---------------------------------------------------------------------------
                     From     To      Width                Au            Ag
# DDH        Depth   ------------------------------------------------------
             (feet)      feet      feet    m         g/T          oz/t  g/T
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 1 BC08-01   516.0   26.0   36.0   10.0  3.0  0.24 (0.28) 0.007 (0.008) N/S
                                                      (i)
                    --------------------------------------------------
                     36.0   40.3    4.3  1.3  2.24 (2.44) 0.065 (0.071)
                    --------------------------------------------------
                     46.0   55.6    9.6  2.9     0.15         0.004
                    --------------------------------------------------
                     55.6   60.2    4.6  1.4  0.66 (0.67) 0.019 (0.020)
                    --------------------------------------------------
                     66.0   69.0    3.0  0.9     0.42         0.012
                    --------------------------------------------------
                     87.0   88.2    1.2  0.4  1.27 (1.37) 0.037 (0.040)
                    -------------------------------------------------------
                    184.3  186.0    1.7  0.5           N/S(i)           1.4
                    ------------------------                            ---
                    332.5  333.6    1.1  0.3                            1.0
                    -------------------------------------------------------
                    386.0  387.7    1.7  0.5     0.10           0.0     N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 2 BC08-02   456.0   12.9   29.1   16.2  4.9     0.15         0.005     N/S
                                                 (iii)         (iii)
                    -------------------------------------------------------
                     29.1   30.1    1.0  0.3  34.3 (35.8) 1.000 (1.044) 1.2
                    -------------------------------------------------------
                     30.1   39.7    9.6  2.9     0.15         0.004     N/S
                                                 (iii)         (iii)
                    -------------------------------------------------------
                     39.7   41.4    1.7  0.5  1.24 (1.28) 0.036 (0.037) N/S
                    -------------------------------------------------------
                     41.4   57.5   16.1  4.9     0.14         0.004     N/S
                                                 (iii)         (iii)
                    -------------------------------------------------------
                     57.5   66.0    8.5  2.6  2.64 (2.48) 0.077 (0.072) N/S
                    -------------------------------------------------------
                     66.0   69.9    3.9  1.2     0.74         0.021     N/S
                                                 (iii)         (iii)
                    -------------------------------------------------------
                     89.7   96.0    6.3  1.9  2.54 (2.68) 0.074 (0.078) N/S
                    -------------------------------------------------------
                     96.0  103.1    7.1  2.2     0.10         0.003     N/S
                    -------------------------------------------------------
                    106.0  114.0    8.0  2.4     0.64         0.019     N/S
                    -------------------------------------------------------
                    196.0  196.7    0.7  0.2           N/S              1.1
                    ------------------------                            ---
                    371.5  376.0    4.5  1.4                            3.6
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 3 BC08-03   206.0                                     N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 4 BC08-04   336.0   38.1   76.0   37.9 11.6     0.16         0.004     N/S
                                                 (iii)         (iii)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 5 BC08-05   406.0   91.3   91.8    0.5  0.2           N/S              1.1
                    -------------------------------------------------------
                    183.1  186.0    2.9  0.9  2.38 (2.49) 0.069 (0.073) N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 6 BC08-06   426.0   70.3   76.0    5.7  1.7     1.32         0.039     N/S
                    -------------------------------------------------------
                    146.0  156.0   10.0  3.0     0.18         0.005     N/S
                    -------------------------------------------------------
                    336.0  346.0   10.0  3.0     0.10         0.003     N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 7 BC08-07   405.0  127.3  128.0    0.7  0.2     0.13         0.004     N/S
                    -------------------------------------------------------
                    155.0  165.0   10.0  3.0     0.10         0.003     N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 8 BC08-08 1,006.0  306.0  308.4    2.4  0.7     0.12         0.004     N/S
                    -------------------------------------------------------
                    396.0  406.0   10.0  3.0     0.18         0.005     N/S
                    -------------------------------------------------------
                    476.0  496.0   20.0  6.1     0.30         0.009     N/S
                                                 (iii)         (iii)
                    -------------------------------------------------------
                    506.0  516.0   10.0  3.0     0.30         0.009     N/S
                    -------------------------------------------------------
                    526.0  546.0   20.0  6.1     0.12         0.004     N/S
                                                 (iii)         (iii)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
 9 BC08-09   856.0   96.0  106.0   10.0  3.0     0.15         0.004     N/S
---------------------------------------------------------------------------
---------------------------------------------------------------------------
10 BC08-10  1168.0  205.0  225.0   20.0  6.1     0.13         0.004     N/S
                                                 (iii)         (iii)
---------------------------------------------------------------------------

Note: (i) assay(repeat//resplit); (ii) N/S: no significant assay;
      (iii) weighted


    The Company initiated operations in the Cariboo District in 1994 and
since that time has focused on the exploration and development of its
gold properties. Mineral tenures in the Historic Cariboo Goldfields
encompass approximately 1,065 square km (106,484 hectares) over a 60 km
long by 20 km wide belt. In the Barkerville Gold Camp, 101 creeks have
reported placer gold production. Recorded gold production from the area
totals more than 3.8 million ounces, including an estimated 2.64 million
ounces from placer mining and 1.23 million ounces from lode mining.
Wayside is in the process of acquiring the QR Mine and 900 tonne per day
QR Mill, which was fully operational until February 2009 (now on care and
maintenance). The QR Mill is a CIP mill designed for an output of 70,000
ounces of gold per annum for that location. The mill is 110 km by road
from Wayside's Cariboo Gold Project and proposed Bonanza Ledge Mine.

    The technical information in this News Release has been reviewed and
approved by Chief Geologist Jim Yin, PhD, P.Geo, a qualified person as
defined in National Instrument 43-101.

    On Behalf of the Board of Directors

    J. Frank Callaghan, President


 
 Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the policies of
the TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.

Contacts:
International Wayside Gold Mines Ltd.
Andrew H. Rees
Director
604 669-6463 or Toll Free: 1-800 663-9688
604 669-3041 (FAX)
www.wayside-gold.com

Copyright 2009, Market Wire, All rights reserved.

-0-

 

Featured Broker sponsored link

Editor's Choice

A selection of our best photos from the past 24 hours.   Slideshow 

Most Popular on Reuters

  • Articles
  • Video