Valero set work at Three Rivers, TX refinery:state
HOUSTON, May 16 (Reuters) - Valero Energy Corp (VLO.N: Quote, Profile, Research, Stock Buzz) filed notice of planned work beginning on Friday at its 100,000-barrel-per-day (bpd) Three Rivers, Texas, refinery, according to a notice filed with state pollution regulators.
The work in Complex 1 of the refinery is scheduled to run through May 26, according to the notice filed with the Texas Commission on Environmental Quality. (Reporting by Erwin Seba; Editing by Christian Wiessner)
© Thomson Reuters 2008 All rights reserved
Ads by Career Builder
Energy Analyst
Details: ...comfort, safety and energy-efficiency of buildings...establishes and monitors energy consumption, utility...Base Tool) to track energy consumption during...
HVAC Energy Engineer, BSME
Details: ...open as of 7/25/2008. HVAC Energy Engineer, BSME HVAC Energy Engineer, BSME, Green Energy Location: New York, NY Salary...
Energy Trading System Consultant
Details: ...immediate opening for an Energy Trading Systems Consultant...client-facing role. The Energy Consultant will be...OpenLink’s Endur (energy) software system...
Energy Manager
Details: ...existing buildings. They currently have a need for a LEED Accredited Professional (AP) to provide energy analysis services.




