Key Developments: Michael Baker Corp (BKR.A)

BKR.A on American Stock Exchange

26.00USD
24 May 2013
Price Change (% chg)

$-0.05 (-0.19%)
Prev Close
$26.05
Open
$26.05
Day's High
$26.05
Day's Low
$25.98
Volume
2,088
Avg. Vol
3,133
52-wk High
$26.55
52-wk Low
$17.92

Search Stocks

Latest Key Developments (Source: Significant Developments)

Michael Baker Corp Secures Contract For Rehabilitation Of Three Pittsburgh Bridges
Monday, 20 May 2013 10:44am EDT 

Michael Baker Corp announced that it has been awarded a five-year, $2.7 million contract by the Allegheny County (Pa.) Department of Public Works for the rehabilitation of the Roberto Clemente (6th Street), Andy Warhol (7th Street), and Rachel Carson (9th Street) Bridges in Pittsburgh. Specifically, Baker will provide preliminary engineering, final design and construction-phase services for the rehabilitation of the three bridges. Included in these services will be bridge inspection, structural analysis and rehabilitation design, utility coordination, maintenance and protection of traffic, roadway design, lighting design, paint evaluation, field surveys, right-of-way investigation, and public involvement services. L.R. Kimball will serve as a subconsultant on the project and will perform the bridge inspection and prepare the rehabilitation plans for the 7th Street Bridge.  Full Article

Michael Baker Corp Secures Contract To Provide Design Services For ODOT District-12 Project
Monday, 6 May 2013 11:23am EDT 

Michael Baker Corp announced that it has been awarded an 18-month, $1.1 million design contract, as part of the DLZ Ohio, Inc., team, by the Ohio Department of Transportation (ODOT), District-12. Baker will provide drainage design and design of temporary traffic control during construction for the widening of I-271 within a six-mile combined section of the I-271/I-480 corridor located in the Ohio communities of Oakwood, Bedford, Bedford Heights and Warrensville Heights. These services will facilitate the safe and efficient movement of traffic through the work zone, and insure the constructability of elements within the project area.  Full Article

Michael Baker Corp Declares Second Quarter Dividend
Thursday, 2 May 2013 03:08pm EDT 

Michael Baker Corp announced that Board of Directors declared an $0.18 per share dividend for the second quarter of 2013, payable on July 2 to shareholders of record on June 12. This represents a $0.02 per share increase from the dividend paid for the first quarter of 2013.  Full Article

Michael Baker Corp's Michael Baker Jr., Inc Secures Design Contract On Derry Borough Bridge
Thursday, 11 Apr 2013 11:16am EDT 

Michael Baker Jr., Inc., an engineering unit of Michael Baker Corporation (NYSE MKT:BKR), has been awarded a contract by the Pennsylvania Department of Transportation (PennDOT), District 12, to design the replacement of the 12-span Derry Borough Bridge in Westmoreland County, Pa. The agreement is for five years and has a total value over the term of $2.2 million. Specifically, Baker will provide preliminary and final design for the project which includes the replacement of the structure over the Norfolk Southern railroad. It also includes reconstructing the approach roadway, pedestrian facilities, lighting, and updating the guide rail, pavement markings, traffic signal and signing. West Third Street will be reconstructed to create a T-intersection with Route 217, and East Third Street will be terminated with a cul-de-sac. Traffic will be maintained over the existing bridge during construction to provide access to local businesses.  Full Article

PennDOT Awards Michael Baker Corp's Michael Baker Jr., Inc Open-End Construction Inspection Contract
Wednesday, 3 Apr 2013 02:32pm EDT 

Michael Baker Jr., Inc., an engineering unit of Michael Baker Corp announced that it has been chosen by the Pennsylvania Department of Transportation (PennDOT), Engineering District 2-0, to provide construction inspection services on a district-wide, open-end contract for projects in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin and Potter Counties, Pa. This $2 million contract began in March 2013 and is expected to last for up to five years. The contract will include various roadway, structure and/or new bridge replacements/rehabilitation construction projects. It is anticipated that up to 20 construction inspectors will be employed on this agreement.  Full Article

Michael Baker Corp's Michael Baker Jr., Inc Secures NJTA Facilities Upgrade Construction Services Contract
Wednesday, 13 Mar 2013 11:26am EDT 

Michael Baker Jr., Inc., an engineering unit of Michael Baker Corp announced that it has been awarded a 23-month, $6.5 million contract to provide supervision of construction services for the first phase of the New Jersey Turnpike Authority`s (NJTA) non-roadway facilities upgrade program, which will bring NJTA`s assets up to current standards and into a state of good repair. Specifically, Baker and its team members will provide a broad range of services in support of the multi-phased program, which includes the replacement of the NJTA District 6 Maintenance Facility and three State Police Stations as part of the first phase of the program. New Jersey project areas planned under this award include Secaucus, Newark, Galloway and Mount Laurel. The total program, scheduled to continue through 2017, includes the construction of over 40 new buildings and rehabilitation of over 50 facilities.  Full Article

Michael Baker Corp's Michael Baker Jr., Inc Secures Design Contract on KTC Lake Barkley Bridge Project
Wednesday, 6 Mar 2013 03:38pm EST 

Michael Baker Corp's Michael Baker Jr., Inc announced that it has been awarded a final design contract for the Lake Barkley Bridge Crossing by the Kentucky Transportation Cabinet (KTC). The two-year, $5.69 million contract, awarded due to an amendment of the existing contract, is for delivery of final bridge design services through 60 % completion.  Full Article

Michael Baker Corp Declares Increased Dividend
Tuesday, 5 Mar 2013 08:30am EST 

Michael Baker Corp announced that Board of Directors declared a $0.16 per share dividend for the first quarter of 2013, payable on April 3 to shareholders of record on March 18. This represents a $0.02 per share increase from the dividend paid in the fourth quarter of 2012.  Full Article

Michael Baker Corp's RBF Consulting Secures Construction Management Contract For Lake Wohlford Dam
Wednesday, 23 Jan 2013 01:00pm EST 

RBF Consulting (RBF), a Company of Michael Baker Corp, announced that it has been selected by the City of Escondido, Calif., to provide construction management (CM) services for construction work related to the new $30 million Lake Wohlford Dam. RBF`s time and materials CM contract is not to exceed $2.4 million.  Full Article

Michael Baker Corp To Provide CM/CI On City Of Chesapeake/Dominion Boulevard Project
Monday, 21 Jan 2013 10:55am EST 

Michael Baker Jr., Inc., an engineering unit of Michael Baker Corp, has been awarded a construction management/inspection (CM/CI) contract for the $188 million, 3.8-mile-long Dominion Boulevard improvements project in the City of Chesapeake, Va. Baker's CM/CI contract, as a subconsultant to McDonough Bolyard Peck, Inc. (Fairfax, Va.), includes a four year term and a value of $7.5 million. The project commenced January 7, 2013.  Full Article

Search Stocks