Analyst Research

Report Title Price
Provider: Stock Traders Daily
$20.00
Provider: MacroRisk Analytics/EconomicInvestor
$25.00
Provider: ValuEngine, Inc.
$25.00
Provider: Pechala's Reports
$25.00

NYSE and AMEX quotes delayed by at least 20 minutes. NASDAQ delayed by at least 15 minutes. For a complete list of exchanges and delays, please click here.

Capstone Turbine Corp Receives Orders Totaling 5mw From Distributor In Mexico For Key CHP And CCHP Projects


Tuesday, 19 Mar 2013 08:30am EDT 

Capstone Turbine Corp announced that it received orders totaling five megawatts from one of its Mexican distributors. DTC Soluciones Inmobiliarias SA de CV received the orders from industrial customers in Mexico. Each of the systems sold will showcase the efficiency of the Capstone microturbine technology by utilizing the waste exhaust in a combined heat and power (CHP) plant. One of the orders, a 2.6MW project for a combined cooling heating and power (CCHP) plant, will be installed at the manufacturing facility of a Company which is doing business in plastic and aluminum closure systems located in northern Mexico. The exhaust from the microturbines will be used to produce both hot and chilled water for the CCHP system. 1MW project will be installed at a Mexican pharmaceutical manufacturer located in Guadalajara. Since the microturbine is dual mode, it will provide the Guadalajara plant with power security even when the local power grid goes down. An existing Capstone customer in central Mexico that specializes in manufacturing packaging material will add a 200 kW microturbine to its existing 600 kW microturbine CHP plant. The original plant was commissioned in October of 2012. Lastly, a ceramic tile and flooring manufacturer will install three 65 kW microturbines running on propane while utilizing the exhaust directly into the facility's drying ovens. 

Company Quote

0.976
-0.0030 -0.31%
30 Oct 2014