Analyst Research

Report Title Price
Provider: Thomson Reuters Stock Report
$25.00
Provider: Reuters Investment Profile
$20.00
Provider: GlobalData
$125.00
Provider: Sadif Analytics Prime
$25.00

NYSE and AMEX quotes delayed by at least 20 minutes. NASDAQ delayed by at least 15 minutes. For a complete list of exchanges and delays, please click here.

Questerre Energy Corp Completes Well 03-19 in Kakwa-Resthaven Area


Thursday, 21 Mar 2013 03:09am EDT 

Questerre Energy Corp announced the test results from its fourth horizontal well (the 03-19 Well) in the Kakwa-Resthaven area of west central Alberta. The well was successfully completed with a 14-stage water-based nitrogen foam fracture stimulation in the 1321 meters horizontal section. Initial clean up and flow back began on March 11, 2013 and the well was tested for a 161-hour period thereafter. Over the last 24 hours of the production test, the well flowed 826 bbl/d of condensate and 5.83 MMcf/d of natural gas against anticipated gathering system pressure of approximately 5000 kPa (725 psi). Production tubing has been installed and the well will be tied into a third party processing plant shortly. Questerre holds a 25% working interest in the 03-19 Well. The operator reported that work will begin to add liquids handling facilities on site to accommodate both the 03-19 Well and the Company's second well, the 14-30 Well, that share the same surface location. Production from both these wells is expected to commence in mid-April 2013. The operator also reported that it is permitting multiple locations and anticipates the next well will spud post spring breakup. 

Company Quote

0.61
0.02 +3.39%
21 Nov 2014