Analyst Research

Report Title Price
Provider: Finlabo SIM Spa
$10.00
Provider: Reuters Investment Profile
$20.00
Provider: Sadif Analytics (Premium)
$25.00
Provider: Thomson Reuters StreetEvents
$75.00

NYSE and AMEX quotes delayed by at least 20 minutes. NASDAQ delayed by at least 15 minutes. For a complete list of exchanges and delays, please click here.

Vinci SA Wins Public-private Partnership Contract Together with Bilfinger SE for East End Crossing in Indiana (USA)


Wednesday, 21 Nov 2012 12:45pm EST 

Vinci SA announced that WVB East End Partners, the consortium led by VINCI Concessions (33.3%) with Walsh Investors (33.3%) and Bilfinger SE's Bilfinger Berger PI International Holdings (33.3%), has been named preferred bidder for the financing, design, construction, operation and maintenance of the Ohio River Bridges Project’s East End Crossing by the Indiana Finance Authority (IFA). The public-private agreement is for a 2,500 feet-long (762 meters) cable-stayed bridge across the Ohio River that will link Louisville, Kentucky to Southern Indiana, a 1,680 feet in length (512 meters) twin-bore tunnel on the Kentucky approach to the bridge, and 19 additional bridges, along with associated roadway improvements and other related infrastructure work. The works, scheduled to take 3.5 years, will be executed by a design-build joint venture including Walsh Construction (60%), VINCI Construction Grands Projets (40%) and Jacobs Engineering for the engineering works. The total value of the contract is around USD 1 billion (approximately EUR 780 million). The consortium, led by VINCI Concessions, will be responsible for the operation, routine maintenance and rehabilitation of the infrastructure for a period of 35 years. It will be paid through license-fees calculated on the basis of the infrastructure`s availability. 

Company Quote

53.13
0.27 +0.51%
29 Jul 2014